Planning & Development (P&D) Department
Dr. Muhammad Sagir
Director Planning & Development
Tel / Ext. : +92 (68) 9232420
The mission of the Planning & Development Department is planning and development of the physical infrastructure of the University consisting of, but not limited to, Buildings and Classroom Facilities, Teaching and Research Laboratories, Academic Departmental Offices, Library Facilities & Campus Study Spaces, Recreation / Athletic Spaces, Food Service Areas, Plant Maintenance, Administrative Offices, Central Services, Health Service Facilities, Common Use & Student Activity Spaces, Assembly
and Exhibition Facilities, Residential Spaces, etc. The Department consists of two wings, Planning Wing and Development Wing. The Planning Wing is responsible for preparing fresh/revised PC- 1’s and medium to long term physical infrastructure
development plans for the University. While the Development Wing is responsible for space programming, master planning, preparation of engineering designs and engineering estimates, preparation of construction and contract documents, and construction administration for the major maintenance, alterations and new construction for all University facilities and building systems. In particular, the Development Wing is responsible for executing the approved / funded PC-1’s and physical development projects.
P&D has the following key responsibilities:
• Preparing Development Plans in line with the Master Plan of the University.
• Exploring funding possibilities for University development projects from funding agencies within the government and outside the government as well as from international development funding agencies.
• Preparing architectural drawings, cost analysis engineering estimates, materials required and labor involved in completion of a Project.
• Developing and implementing a quality audit program, monitoring contractor corrective actions and ensuring a quality project conforming to plans and specifications.
• Maintenance & Facilitation
Sr. No. | Title | Submitted To |
Establishment of KFUEIT, Rahim Yar Khan Phase-1 (Revision) | Higher Education Department, Government of Punjab | |
Establishment of KFUEIT, Rahim Yar Khan Phase-2 | Higher Education Department, Government of Punjab | |
Long Term Sustainability Project for KFUEIT | Higher Education Department, Government of Punjab | |
| Provision of Necessary Infrastructure and Supporting Facilities for High-Quality Education at KFUEIT, Rahim Yar Khan |
Higher Education Commission |
| Establishment of Centre for Research and Innovation in Food, Energy, Environment, Material and Forensic Science |
Higher Education Commission |
- Establishment of KFUEIT RYK, Phase-1 (Revision)
Khwaja Fareed University of Engineering & Information Technology was established in 2014 under The Punjab Assembly passed Act (Act XVI of 2014) for KFUEIT on 29th May 2014. In the beginning, classes of BS Electrical Engineering, BS Mechanical Engineering, BS Computer Science and BS Information Technology were started in Government College of Technology, Rahim Yar Khan. It moved to its own campus in January 2016.
Initial PC-1 Phase-1 of worth PKR 3,847 Million was prepared and submitted by UET Lahore in April 2014 to Higher Education Department. It mainly included purchase of land, physical infrastructure development such as the construction of 6x academic buildings, hostels for students and faculty, common facilities, residences, external development, horticulture and procurement of lab equipment, books, furniture, and transport facilities.
Due to some important factors such as an increase in the cost of development and quantities, revised rates of bi-annuals, budget constraints, increase in material cost, a revision of Phase-1 was submitted on April 2019 against PKR. 6,108.31 Million, which is under revision phase.
1.1 Physical Developmental Progress & Plan Summary of Phase-1
Following is the current progress and future plan summary for Phase-1 which shows the status of the physical infrastructure and supporting facilities:
Sr. No. |
Description | Physical Progress (in % age) | Status / Plan |
1 | Land | 100 | Completed |
2 | Academic Buildings |
|
|
| a. Construction Work of the Department of Electrical Engineering | 100 | Completed |
b. Construction Work of the Department of Mechanical Engineering | 100 | Completed | |
c. Construction Work of the Department of Information Technology & Computer Science | 85 | *Dec. 2019 | |
d. Construction Work of the Department of Computer Engineering & ICT | 100 | *Dec. 2019 | |
e. Construction Work of the Department of Civil Engineering | 100 | Completed | |
f. Construction Work of Department of Basic Sciences, Humanities and Business Management | 85 | *Dec. 2019 | |
3 | Hostels |
|
|
| a. Hostel for 150 students | 25 | June 2020 |
| b. Faculty Hostel | 75 | *Dec. 2019 |
4 | Building of Common Facilities |
|
|
| a. Construction Work of Library | 25 | *June 2020 |
| b. Construction Work of Admin Block + Two Rooms one each for Tube well and Electric substation. | 25 | *June 2020 |
5 | Residential Buildings | 75 | *Dec. 2019 |
6 | External Development etc. |
|
|
| i (a). Infrastructure Development (Main Boulevard Road) | 100 | Completed |
| i (b). Infrastructure Development (Water Supply, Sewerage, Roads) | 80 | *Dec. 2019 |
| ii. Boundary Wall | 100 | Completed |
| iii. Four Gates and Pillars etc. | 100 | Completed |
| iv. Overhead reservoir 75,000 Gallon @ 150M/Gallon | 60 | *June 2020 |
| v. Tubewell of 01 Cusec | 100 | Completed |
| vi. WAPDA Connections & Security Charges | 45 | *Dec. 2019 |
7 | Horticulture / Tree plantation | 100 | Completed |
8 | Lab Equipment | 100 | Completed |
9 | Books | 100 | Completed |
10 | Furniture | 100 | Completed |
11 | Transport | 100 | Completed |
12 | Contingencies | 100 | Completed |
* All dates provided are relative to funds availability if funds will be released in June 2019
1.2 Buildings, Covered Area and Cost Summary of Phase-1
The details of physical infrastructure along with their covered area and cost are as follow:
Sr. No |
Building | Covered Area per Unit (in sq. ft.) | Total Covered Area (in sq. ft.) | Cost (in PKR Million) |
Department of Electrical Engineering | 66,648 | 66,648 | 171.981 | |
Department of Mechanical Engineering | 72,584 | 72,584 | 186.487 | |
Department of Information Technology & Computer Science | 59,944 | 59,944 | 155.549 | |
Department of Computer Engineering & ICT | 66,342 | 66,342 | 170.831 | |
Department of Civil Engineering | 73,332 | 73,332 | 188.315 | |
Department of Basic Sciences, Humanities & Business Management | 66,264 | 66,264 | 170.994 | |
Hostel for 150 Students | 57,186 | 57,186 | 141.751 | |
Faculty Hostel (07 Sets) | 5,120 | 35,840 | 119.289 | |
Main Library | 79,382 | 79,382 | 191.577 | |
Administration Block | (42,671 + 1,003) | 43,674 | 120.268 | |
A – Type Residences for BPS 20-21 (4 Units) | 3,815 | 15,260 | 35.572 | |
B – Type Residences for (4 Units) | 3,020 | 12,080 | 28.124 | |
E – Type Residences for 5 set (20 Units) | 5,190 | 25,950 | 46.559 | |
F – Type Residences for 5 set (20 Units) | 3,944 | 19,720 | 38.201 | |
| Grand Total | 682,126 | 1,765.498 |
- Establishment of KFUEIT RYK, Phase-2
As KFUEIT is a multi-billion project, therefore it is divided into phases. The new infrastructure development requirements that are included in Phase-2 were either not included, or left over in Phase-1 and not sufficient with the increase in the number of students.
Phase-2 was submitted against PKR 2,000 Million in May 2019. Funds amounting Rs. 370 Million has been allocated in the ADP 2019-20 by the Government of the Punjab, against estimated cost of Rs. 2,000 Million for Phase-2 to provide additional facilities. Whereas the remaining amount PKR 1,630 Million has been projected in 2020-21 and 2021-22 respectively.
Likewise Phase-1, Phase-2 will mainly include physical infrastructure development. A summary of Phase-2 is as follow:
Sr. No. | Title | Description |
1 | Hostels | 4x Hostel for Student |
2 | Supporting Buildings |
|
3 | New Boundary Wall | 5,800Rft |
4 |
Infrastructural Works |
|
5 |
Revenue Items |
|
- Long Term Sustainability Project for KFUEIT, RYK
Long Term Sustainability (LTS) for KFUEIT has the following two parts.
Sr. #
| Description | Total Cost (in PKR Million) |
Faculty Development Programme | 6,090 | |
Endowment Fund | 2,000 | |
Total Cost of the Project |
8,090
|
- Faculty Development Programme (FDP): FDP will produce 250 - 350 Ph.D. qualified individuals in the next 5 years with the use of 50 international scholars in order to fulfill the high-quality faculty requirements of KFUEIT and other educational, research and development organizations in Punjab as well as throughout Pakistan.
- Endowment Fund: Public sector institutions like KFUEIT requires financial assistance to sustain their operations. Most of the public sector universities are highly dependent on the annual grant provided by the Higher Education Commission of Pakistan. Keeping in view, KFUEIT prepared a well thought out Business Plan under Endowment Fund if it is seeded by a grant of PKR 2,000 Million from the Government of Punjab.
This project was submitted in March 2019. LTS funding if implemented faithfully, will ensure the long term sustainability of KFUEIT and will enhance entrepreneurship opportunities, more industrial collaborations and contribution in filing patents, etc.
- Provision of Necessary Infrastructure and Supporting Facilities for High-Quality Education at KFUEIT, Rahim Yar Khan
The PC-1 for Provision of Necessary Infrastructure was submitted to HEC in August 2018. The objective of the proposed PC-1 is to strengthen KFUEIT, RYK by providing additional required physical infrastructure and facilities essential for higher education and left out during Phase-1 due to limited funds.
These include infrastructure consisting of high-voltage electrification work, 2.5 MW On-grid Solar Power System, miscellaneous items such as IT networking within campus and 200 computers for computer labs.
Laboratory equipment for new disciplines such as Chemical Engineering, Agricultural Engineering and Food Science & Technology are required to provide the essential missing facilities and to accommodate the foreseen growth in students, faculty and other staff numbers.
S. No.
| Description | Total Cost (in PKR M) |
Infrastructure Works |
1,209.78 | |
| High-Voltage Electrification | |
| 2.5 MW On-grid Photo-Voltaic Solar Power Solution | |
Miscellaneous Items |
- Establishment of Center for Research & Innovation in Food, Energy, Environment, Material and Forensic Science
Research and Innovation are among the main drivers of higher education development that leads to economic growth. Research and Innovation Centre is the appetite and desire of the students to innovate and to do something entirely new.
PC-1 for the Establishment of Centre for Research and Innovation was submitted to HEC in March 2019 against PKR 2,323 Million for their necessary actions. Summary for the proposed PC-1 is as follow:
Sr. No. | Description | Total Cost |
1 | Construction Work of Innovation Centre |
2,323.09 |
2 | 2.5 MW Solar Power Plant | |
3 | Installation of Anaerobic Digester | |
4 | Revenue Items | |
a) | Library Books | |
b) | Lab Equipments | |
| Bio-Chemistry Labs | |
| Bio-Technology Labs | |
| Food Science & Technology Lab + Forensic Labs |
At present KFUEIT has 400 acres of land but it aims to acquire additional land in the near future. KFUEIT plan to acquire additional land is to minimize security risk, as the current land area is irregular in shape which increases security and surveillance cost. Moreover, the additional land adjacent to KFUEIT campus is agricultural land and the value of the land is affordable which will certainly increase with the passage of time. Additional land will be utilized for further expansion of academic buildings, hostels for faculty and students, residences along with admin block, student center, grand mosque, central library, auditorium, botanical garden, solar power plant, grid station, agricultural research farm, technology park, waste treatment facility (anaerobic digester), dairy research farm, museum for heritage, science & technology, indoor sports complex, gym and other developmental projects.